免费无码一区二区三区蜜桃_人妻内射一区二区在线视频_亚洲精品1区2区_波多野结衣一区二区三区中文字幕_免费一本色道久久一区_亚洲性福利

×

News

Conch Chuangye Wuwei Haichuang Domestic Waste-to-energy Project Successfully Realizes the First Car of Waste into the Plant
Date:2021-12-07 From:海螺創(chuàng)業(yè)

        With the correct leadership of the company and the strong support of various departments, with the cooperation and cooperation of the construction unit, the supervision unit, the participating units and the brothers, all the staff of Conch Venture will work together, December 5, 2021 10 At 18 hours, the Wuwei Municipal Solid Waste Incineration Power Generation Project realized the smooth entry of the first vehicle of solid waste into the plant. Wuwei Urban Management Bureau, Shijian Town Government, all staff of Conch Venture Wuwei Haichuang and relevant persons in charge of the participating units of the Wuwei Project witnessed this moment.

825aefb77dd1bc08762ce7b18994d46.jpg

The first garbage truck entered the factory smoothly 

        At 10:18 in the morning, the domestic garbage truck of Wuwei City was accompanied by a rumbling of firecrackers, dressed in red silk and red flowers, under the command of the Wuwei Haichuang site staff, passing the logistics gate, floor scales, and trestle slowly. Drive into the unloading hall. With the call of "Conch Venture Wuwei Haichuang's First Garbage Start Unloading", the household garbage was smoothly discharged into the garbage pit.

1b04ffa253032227961f55530d3ca0b.jpg

Group photo 

        The Conch Chuangye Wuwei Haichuang project is equipped with 2×500 tons/day mechanical grate furnace domestic waste incinerators. The project is planned at one time and implemented in two phases. The first phase of the project has a processing scale of 500 tons/day, and it can process domestic waste after reaching production capacity18 10,000 tons/year.

3d29ccb92d37edcdd7eebc8db6ec8fe.jpg

Conch Chuangye Wuwei Haichuang Domestic Waste Incineration Power Generation Project (Aerial View) 

        Conch Chuangye Wuwei Haichuang’s first truck of garbage entered the plant smoothly, marking the end of the construction of the Wuwei municipal solid waste incineration power generation project, which is about to enter the trial production stage, and the project will enter the "countdown" for grid-connected power generation. Conch Entrepreneurship and Wuwei Haichuang all staff will continue their efforts and sprint with all their strength, starting from the ceremony of the first truck of garbage entering the factory, supervising the completion of the project, making solid preparations before trial production, and launching a sprint to the grid-connected power generation target within the year. Make more contributions to the harmless treatment of domestic garbage and the improvement of the living environment in Wuwei City!

主站蜘蛛池模板: 合水县| 凤城市| 体育| 九江县| 贺兰县| 平遥县| 锡林郭勒盟| 五原县| 墨竹工卡县| 龙游县| 怀宁县| 前郭尔| 永州市| 荆州市| 海林市| 昌宁县| 乡宁县| 南澳县| 剑川县| 东光县| 长岭县| 绍兴县| 荔浦县| 万山特区| 长子县| 法库县| 扎鲁特旗| 东丰县| 怀安县| 襄垣县| 神木县| 沅江市| 进贤县| 望江县| 鹤庆县| 报价| 遵义县| 东宁县| 洪雅县| 石台县| 洛隆县|